Laying Wooden Floor

The laying of wooden floors should pay attention to the details of many constructions. Otherwise, there will be many problems in the laying of wooden flooring. The laying of wooden flooring should be based on the material of the flooring to select the correct laying method. At the same time, the laying of wooden flooring should follow a series of The process, pay attention to a lot of detailed problems, in order to ensure that the wooden floor can be put into use later, then, how to lay the wooden floor? What are the common problems of the wooden floor?

Is the wooden floor good?

The wood flooring industry is an emerging industry. It originated in the early 1980s. With the vigorous development of China's economy and the increasing living standards of its residents, the wooden floor has outstanding advantages such as comfortable feet, warmth and elegance. It has become the material of choice for people's floor decoration, and its market demand is also on a straight upward trend. The laying of wooden floors requires attention to many problems.

How to lay wooden floor

1. When laying wooden floors, prepare according to the number of floors, and provide corresponding accessories, such as rubber pads, bridge beading, T-shaped beading, welt beading, and skirting board. The base layer is required to be flat, dry, clean, and has a shovel with a blade. If the slope or the recess is obvious after shoveling, use a gypsum binder to mix 30% of the coarse sand to smooth it. Ash and other impurities so that it does not leave any ash and debris on the ground.

2. The direction of the cushion layer is perpendicular to the direction of the floor strip. When adding the moisture-proof film, it should overlap 200mm. The first three rows are required to be tested - that is, no plastic paving. When paving the floor, the direction of the floor is usually consistent with the length direction of the room. The principle of row-by-row installation is observed. At the same time, the cross-section of the board surface is observed. When there is no height difference and seamless, the glue can be installed and the block should be padded. In the latter row of floors, the width of the floor should be measured by appropriate methods for cutting, sizing, and tightening with a hook or a spiral top.

3. In the process of laying the wooden floor, if the pipe , column foot, etc. are encountered , the hole cutting and glue installation should be properly carried out, and the proper clearance should be maintained. When the gel is slightly solidified, it should be shoveled in time and cleaned with a damp cloth. At least 12 hours after the paving is completed, it is not allowed to walk on the floor for 12 hours, so that there is enough time for the floor glue to bond. It is recommended to add waterproof glue to the bathroom, kitchen and floor joints.